Engineering and EIS for a new tunnel would be at least $200-$300 million. This study is $200k. Let's not pretend that by looking at this as an option is taking away dollars from a project that isn't beyond a cursory "this is what it might look like" presentation.
I reserve all opinions on the project until the study proposes something concrete.